Case study · Menzi Muck
Three days in a gravel plant: the MK II hybrid drive on a Menzi Muck dumper
4QT integrated its 135 kW MK II hybrid-electric drive into a Menzi Muck 45rd dumper and proved it over three hard days at a Versam gravel plant, in front of Menzi Muck's own customers.

Less fuel, with more power
MK II hybrid-electric drive
Under real load, real operators
Chassis modifications
- Machine
- Menzi Muck 45rd dumper
- Core
- iREX MK II
- Power
- 135 kW
- Location
- Versam, Graubünden, Switzerland
- Duration
- 3 days · 11-13 Sept 2025
- Domain
- Construction
The challenge
A new powertrain is only worth anything if it survives contact with the work. Construction operators don't electrify on promises: they need lower running costs without giving up power, and they can't afford charging infrastructure or downtime on a remote site. The harder test is cultural: would the people who run these machines for a living accept a re-powered dumper as their own?
So the bar wasn't a clean demo. It was a production machine, on a production site, judged by operators with no reason to be polite.
What we did
Over roughly two months, the 4QT team integrated the 135 kW MK II hybrid-electric drive into a Menzi Muck 45rd dumper, powering both traction and hydraulics from a single core. Critically, the base vehicle was untouched, zero chassis modification. The drive swaps in; the machine an operator already knows stays the machine they know.
Then it went to Versam, in the Graubünden mountains, for a customer roadshow: three hard days, 11–13 September 2025, working a real gravel plant under real load.
The results
It held, and it changed how the machine performed:
- ~40% less fuel, with noticeably more power. This shifts a machine's operating economics, not just its emissions sheet.
- No charging, ever. Onboard generation means the machine refuels the way it always has: no charging infrastructure, no downtime planning, no range anxiety on a remote site.
- Zero-emission mode on demand. Silent, emission-free running when the job or the location calls for it.
- Zero chassis modification. Re-powering the iron a fleet already owns, rather than replacing it, is how electrification and autonomy-readiness actually reach the field.
Passing this in front of an OEM's own customers was worth more than any spec sheet 4QT could publish.
Why it matters
This is the construction proof point for the 4QT core: the same architecture that makes a machine cleaner and cheaper to run is the architecture that makes it autonomy-ready. The MK II delivered a by-wire, hybrid-electric drive into a working dumper without touching its chassis, exactly the retrofit path a builder needs to put autonomy onto the machines already on site, not just onto new ones. Prove it in the dust, and the spec sheet takes care of itself.
We didn't demo it on a stand. We put it in a production machine, on a production site, and let the people who run these dumpers for a living push it.
4QT crew, Versam roadshow
Source: 4qt-website-2026.vercel.app/news/menzi-muck-roadshow